New Building 2.0

Our crew has been hard at work including the kids. Each night, we head out to the studio to pick up and get it ready for the next days work. This week, almost the entire building got sheet rocked. That’s a lot of sheet rock!! The plumbers have been hard at work too! We now have running water to the building. All the drains, toilets, sinks and the water fountain are set to be hooked up.

boys

The boys helping with cleanup.

WomensThe women’s locker room.

MensMen’s locker room.

EntrywayFoyer

Large Studio2Large studio

Large StudioLarge studio from the rear.

Small studioPersonal training studio

       

About The Author